Hi, i still have the problem that with our hobbit we are unable to generate more then de daily graph. Plese feel free to bash us for stupidity or maybe helb us with an easy way to get this problem solved.
We tried to deinstall and started from scratch. So there ist in the "configure.server" one config line, where you set the wanted graphs.
***The Hobbit history webpage by default displays a 1-day ***graph of the history. It can also show a 1-week, 4-weeks and ***1-year graphs, or any combination of these.
***Which graphs to show by default (1d/1w/4w/1y/all) [all]
We would like to have all (so against the starting lines) hence we said YES to all...
But this does not work! Only the daily graph is displayed :(
Digging in the Makefile and redoing the setup, leads to the following difference:
using: Which graphs to show by default (1d/1w/4w/1y/all) [all] <return>
--> results
Default history graph setting
HISTGRAPHDEF = -DDEFPIXELS=960 -DDEFBARSUMS=15
using: Which graphs to show by default (1d/1w/4w/1y/all) [all] 1d/4w <return>
--> results
Default history graph setting
HISTGRAPHDEF = -DDEFPIXELS=960 -DDEFBARSUMS=5
Are we right that the Variable: "-DDEFBARSUMS" is the point to fiddle with?
Can this be changed in a working hobbit?
Anybody?
Thanks in advance Mathias
On Tue, Feb 07, 2006 at 11:26:22AM +0100, brandste at hebis.de wrote:
Hi, i still have the problem that with our hobbit we are unable to generate more then de daily graph. Plese feel free to bash us for stupidity or maybe helb us with an easy way to get this problem solved.
Did you try clicking on that daily graph ? It's a link to the graphs that go further back in time.
***Which graphs to show by default (1d/1w/4w/1y/all) [all]
We would like to have all (so against the starting lines) hence we said YES to all...
Ah, OK - those are the text-mode history availability graphs. I know this is confusing, and in fact I've removed that question from the configure script in the next version.
Regards, Henrik
Hi Henrik,
thanks for clarification. (Sorry for my misleading question, we saw the other graphs but are not able to present them direclty with the test-result.
By clicking on eg. CPU, there is only one graph showing. Clicking on that graph, or using the keyword: action=menu, we see the more historical graphs. [here without the output of the testskript] )
Would there be a possibility to permanently show more then the 48hours Graph say at tests like cpu, memory or temperatures? Do you plan something like that for the next or following versions?
The text-mode history is a very helpfull tool! And where graphs can't tell which state was present the only way to get the information. Good the switch [all] existed!
Best Mathias
In message <20060207113250.GA30588 at hswn.dk>, Henrik Stoerner writes:
On Tue, Feb 07, 2006 at 11:26:22AM +0100, brandste at hebis.de wrote:
Hi, i still have the problem that with our hobbit we are unable to generate more then de daily graph. Plese feel free to bash us for stupidity or maybe helb us with an easy way to get this problem solved.
Did you try clicking on that daily graph ? It's a link to the graphs that go further back in time.
***Which graphs to show by default (1d/1w/4w/1y/all) [all]
We would like to have all (so against the starting lines) hence we said YES to all...
Ah, OK - those are the text-mode history availability graphs. I know this is confusing, and in fact I've removed that question from the configure script in the next version.
Regards, Henrik
To unsubscribe from the hobbit list, send an e-mail to hobbit-unsubscribe at hswn.dk
participants (2)
-
brandste@hebis.de
-
henrik@hswn.dk