1 Mar
2005
1 Mar
'05
12:09 a.m.
Hi,
So I've gotten some new data being graphed in Hobbit. However, I've got a request to set it up in such a way that I don't lose granularity. Basically I want to be able to define the rrd with 2 years worth of data points. Is such a thing possible in Hobbit?
-- Bruce Z. Lysik <blysik at shutterfly.com> Operations Engineer