thorsten.erdmann at daimler.com wrote:
Hi,
can I somehow tell Hobbit to ignore bad test results in certain times, like the DOWNTIME tag does for network tests? e.g. I do some Oracle database tests and shutdown the databases on weekends for backup. I don't want this planned downtime to appear in the Non-Green-Systems View and in the Availability reports.
Maybe I can "missuse" the badTEST tag somehow?
Thanks Thorsten Erdmann
If you are not the intended addressee, please inform us immediately that you have received this e-mail in error, and delete it. We thank you for your cooperation.
If this is really planned and regularly scheduled, then use the DOWNTIME tag. If it can be variable, you can schedule downtime in advance with the enable/disable menu item.
-- Rich Smrcina Phone: 414-491-6001 http://www.linkedin.com/in/richsmrcina
Catch the WAVV! http://www.wavv.org WAVV 2010 - Apr 9-14, 2010 Covington, KY